With relatively nothing done in the last week of 2017 and the same in the first week of 2018, it's time to pick up the slack.

Several more sections of track in the lower section have gone down. Several sets of points, with a lot of wires. I just need to acquire the last two sets of points and things are good to go.
Posted 16-01-2018 at 02:57 PM by Ginger The Hutt Ginger The Hutt is offline
Old
Ginger The Hutt's Avatar

Welcoming in 2018

So this 'week & weekend' update is a bit late.

Obviously all the planned projects to crack on with, have been ignored. This was unintentional. Kinda. Last week, SWMBO & I went away for a few days to Hull & York. Yes, I managed to swindle a visit to the NRM. I'm a lucky boy.

Aside from a few pencil markings having happened with the bridge, a few bits of track having been turned over and a slightly different wiring process decided upon with regard to the lower section of track and finally a few measurements with the foundation support have been taken, nothing much has been done on the objective front.

However, the monster and I, undertook an extensive cabinet reshuffle over the weekend.
Here is a picture link showing our efforts.

I have lost some of my enthusiasm for the lower levels as mostly it's all flipping soldering. I really don't like soldering all that much. :/ *needs a kick in the butt*
Posted 10-01-2018 at 02:21 PM by Ginger The Hutt Ginger The Hutt is offline