Model Railway Forum

Go Back   Model Railway Forum > Members Projects


Old

Welcoming in 2018

Posted 31-12-2017 at 07:55 PM by Ginger The Hutt
So as 2017 draws to a timely end, I thought it would be a fun idea to look back a year and see what I was doing on the layout this time last year.

I had thought that I had the baseboards partially in place and had at least started laying the incline foundations. Turns out I was several months ahead of myself there. I had barely started the incline corridor baseboard. It leaves me surprised at how much I have achieved in the year.

December Objectives Recap &...
Ginger The Hutt's Avatar
The Ginger One
Posted in Uncategorized
Comments 2 Ginger The Hutt is offline
Old

11 & 12 / 17

Posted 03-12-2017 at 10:35 PM by Ginger The Hutt
November has quite the month.

November Objectives Recap & Review:
  • Actually fix Percy. Yeah.
    Nope. Just going to buy a new one.
  • Begin building the foundations for the upper level. 95% done. I just need to put in place a central support.
  • Make a start on the double track suspension bridge kit bash. Started. Paused.
    Tools acquired, to be continued.
  • Build the baseboard section around the control panel, extend the track appropriately & sort the final plans
...
Ginger The Hutt's Avatar
The Ginger One
Posted in Uncategorized
Comments 1 Ginger The Hutt is offline
Old

10 & 11 / 17

Posted 02-11-2017 at 09:25 AM by Ginger The Hutt
October Objectives Recap & Review:
Continue laying more track: In particular the lower level. More track got laid.
Just not in the preferential lower section.

Get the initial control panel into place and working. Done! A really good start on the panel has been achieved. Now to build around it.
Fix Percy properly, or have the parts on order at least. Yeah... oops.
Make a start on foundations of the top layer. I have the plans for the foundations forming in...
Ginger The Hutt's Avatar
The Ginger One
Posted in Uncategorized
Comments 5 Ginger The Hutt is offline
Old

Thoughts on Weathering

Posted 31-10-2017 at 04:08 PM by Brocket Hall
An 00 GWR layout I saw at an exhibition recently was beautifully executed. Set in pre-nationalisation days it certainly caught the atmosphere of the old branch lines and, as the owner/operator pointed out, everything was weathered to a certain extent, trains and structures alike. He went on to say that it was his first layout and I complimented him on quite an achievement. He looked as though he was in his mid-thirties, so could have no memory of what he set out to model, but said that the older...
Junior Member
Posted in Uncategorized
Comments 1 Brocket Hall is offline
Old

Starting from scratch

Posted 26-10-2017 at 11:26 AM by Nokonium
Julie's Studio to become The Train Shed

Layout size - 12ft x 6 ft (access to both long sides and one short side).

Baseboard 1/2 plywood with 2"x 1" battens and 3" x 2" adjustable legs.

Layout design software - AnyRail 6

Gauge to be used - OO

Model Railway Controller - Gaugemaster DCC02

Track - Peco

Status as at 26/10/2017 - Clearing out art stuff from Studio.
Member
Posted in Uncategorized
Comments 1 Nokonium is offline


All times are GMT +1. The time now is 11:49 AM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.