Model Railway Forum

Go Back   Model Railway Forum

Projects From The Members of Model Railway Forum
Random featured blog entry from Clay Hills International
Ginger The Hutt's Avatar

Internets & delays (of course)...

Posted 23-01-2017 at 09:44 AM by Ginger The Hutt
Well, December and January were much more expensive than planned. To the extent that all unnecessary expenditure was curbed. That has severely limited the amount of work I can do in the Hut. Especially so, as the inclines I was waiting for in the previous note, still have not graced the Hut with their presence.

The incline problem is that the inclines are at the back of the layout. I can't reach the back of the layout, if the layout is in place in front of it. So any work I do,...

All times are GMT +1. The time now is 08:28 PM.

Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.